The Pensacola Bay Bridge multi-use path is scheduled to open to the public this afternoon. The path will allow bicycles and pedestrians to safely cross from Pensacola to Gulf Breeze and has gone through multiple delays, including a redesign. State Senator Doug Broxson said without the path, pedestrians had no legal way to cross the bridge, and cyclists had to ride in traffic. Christian Wagley, executive director of Bike Pensacola, said he plans to put together a small, physically distanced group ride along the path once it opens Monday.