The Florida Department of Transportation says its contractors are increasing efforts to repair the Pensacola Bay Bridge by March 2021 and they have added an additional pile-driving crew. The FDOT said 8 fully damaged spans and 13 partial damaged spans removed along with 21 damaged pedestrian path beams. 66 damaged I-beams have been removed with eight replaced and 30 replacement piles have been driven.